Water connections
Refer to the certified dimensional drawings for the sizes and
positions of all water inlet and outlet connections. The water
pipes must not transmit any radial or axial force to the heat
exchangers or any vibration to the pipework or building.
The water supply must be analysed and appropriate filtering,
treatment, control devices, isolation and bleed valves and
circuits built in, as necessary. Consult either a water treatment
specialist or appropriate literature on the subject.
Operating precautions
The water circuit should be designed to have the least number
of elbows and horizontal pipe runs at different levels. Below
the basic checks to be done (see also the illustration of a typical
hydraulic circuit below).
Note the water inlets and outlets of the heat exchangers.
Install manual or automatic air purge valves at all high
points in the water circuit.
Use an expansion chamber or an expansion/relief valve to
maintain pressure in the system.
Install water thermometers in both the entering and
leaving water connections close to the evaporator.
Install drain valves at all low points to allow the whole
circuit to be drained. Connect a stop valve in the drain line
before operating the chiller.
Install stop valves, close to the evaporator, in the entering
and leaving water lines.
Use flexible connections to reduce the transmission of
vibration to the pipework.
Insulate all pipework, after testing for leaks, both to
reduce thermal leaks and to prevent condensation.
Cover the insulation with a vapour barrier.
Condenser connections
The condenser is of the multi-tube shell and tube type with
removable water boxes to facilitate cleaning of the tubes.
Before making water connections tighten the bolts in both
heads to the lower torque shown, following the method
described. Tighten in the pairs and sequence indicated
according to the size of bolt (see below) using a torque value at
the low end of the range given.
Pipe connections
After welding the pipes to the flanges previously removed from
the water boxes:
a. Reinstall the pipes and tighten lightly to a torque at the
low end of the range.
b. Fill the system with water.
c. Wait for 10 minutes and check for minor leaks
- at the water box joints
- at the flange joints
d. Drain the system.
e. Disconnect the pipework.
f. Tighten the head bolts to their final torque (middle of the
range) in the sequence illustrated.
g. Reconnect the water pipes, tightening the flange bolts to
the mid-range torque value.
h. Refill the system with water.
i. Pressurize the system.
NOTE: We recommend draining the system and disconnecting
the pipework to ensure that the bolts of the heads to which the
pipework is connected are correctly and uniformly tightened.
If there is a leak outside the water head:
a. Drain the system.
b. Disconnect the water pipes.
c. In the correct sequence, retighten the head bolts to the
maximum torque given for the bolt size.
d. Reconnect the pipework, tightening the bolts to their final
torque value, i.e. the middle value in the range given for
the bolt size.
e. Refill the system with water.
f. Pressurize the system.
Freeze protection
Cooler and water-cooled condenser protection
If the chiller or the water piping is in an area where the ambient
temperature can fall below 0°C it is recommended to add an
antifreeze solution to protect the unit and the water piping to a
temperatures of 8 K below the lowest anticipated temperature.
Use only antifreeze solutions, approved for heat exchanger
duty. If the system is not protected by an antifreeze solution
and will not be used during the freezing weather conditions,
draining of the cooler and outdoor piping is recommended.
Typical hydraulic circuit diagram
Water box tightening
sequence
7
4
6
2
8
3
5
1
Bolt size M12 - 71-87 Nm
Bolt size M16 - 171-210 Nm
Bolt size M20 - 171-210 Nm
Sequence 1: 1 2 3 4
Sequence 2: 5 6 7 8
Air vent
Heat exchanger
Drain
Pressure tap
Thermostat sleeve
Flexible connection
Flow switch
Control valve
Filter
Expansion tank
Fill valve
Buffer tank