39 HQ AiroVisionInstallation, Operation andMaintenance Instructions

Pagina 2 - Revision No: 08082011

10Method 1 Pull the sections against each other, using the pull ropes attached to the lifting bars. Pull evenly on both sides of the AHU. 5.2. Connec

Pagina 3

11Figure 17. Fixing the connection stripThis method applies for sections that end with corner posts.Figure 15. Fixing the sealing tape to the joint mu

Pagina 4

126. STACKED CASING SECTIONSFor an outdoor installation the plastic roof cover must be finished as described in chapter 8.NOTE: If the AHU needs to co

Pagina 5 - 1.3. Instruction Types

13Figure 24. Mounting profile, indoor location, unit without intermediate base frameOutdoor Installation• Position the casing sections on top of one a

Pagina 6 - 2.2. Transport and Storage

14Figure 27. roof finish, unit with shorter top section without intermediate base frame • A longer top section needs no further finish at the ends. F

Pagina 7 - 2.5. Horizontal Transport

15Figure 30-1. Stacking, indoor location with interme-diate base frameFigure 30-2. Fixing profile, indoor location with inter-mediate base frame There

Pagina 8 - 3. PREPARATION for ASSEMBLY

166.3. Unit with Different WidthsFor units with different widths, there are four different situations. For an indoor installation the method desc-ribe

Pagina 9 - 5. ASSEMBLY

171234Cross section of width directionFigure 37. - Width direction view, unit of unequal width Figure 38. - Length direction view, unit of unequal wid

Pagina 10

18Figure 41. - Unit of unequal width - situation B• Side 1 and 2: Cut the connection profiles to the correct length and mount them on the co

Pagina 11

19• Side 1 and 2: Cut the connection profiles to the correct length and mount them on the correct side (see Fig 44).• Side 3: Cut the

Pagina 12 - 6. STACKED CASING SECTIONS

Code No: B.8.1.3.i Publication Date: 08082011Revision No: 08082011

Pagina 13

20 !CAUTION! Before starting up the AHU ensure that the components have the correct connection voltage and connect them in accordance with the

Pagina 15

2210. START-UP INSTRUCTIONS10.1. CasingThe label with the unit data, such as order number, position number etc. is usually located on the acccess cove

Pagina 16

2310.7. Dampers10.8. Air Filters10.9.1. General10.9.2. Electric Heaters10.9. Heaters-Check if the actuator motor is installed in accordance with the s

Pagina 17

2410.11. Coolers-Check the connections in accordance with the di-mensional drawing.-Control the connections for leaks.-Check drain trap. If Alarko Car

Pagina 18

25-Check that the wheel is rotating in the correct direc-tion.This is indicated by an arrow on the casing.-Check if the wheel seals are fitting correc

Pagina 19 - 8. ROOF COVER

26!WARNING! Before opening doors, switch off and deenergise the fan, and ensure that it has stopped rotating (minimum of 2 minutes)-Check the splitter

Pagina 20

27The checklist contains a general overview of the planning that facilitates the inspections and maintenance of the AHU. On the following pages there

Pagina 22

29The AHU(s) require little maintenance. The smooth inside and outside finish of the panels makes main-tenance very simple.For dry sections: once a ye

Pagina 23

Contents1 - SAFETY CONSIDERATIONS ... 51.1. General ...

Pagina 24 - R=(P/10) - 30

30Check once a year for contamination, and if neces-sary clean with compressed air. Check the connec-tions in the control box. Check the operation of

Pagina 25

31-First carefully read the instructions from the supplier. The following points require extra attention.-Check the connections of the high-pressure p

Pagina 26

32HÜCRE NO: 1 HÜCRE NO: 2 HÜCRE NO: 3 HÜCRE NO: 41 1 2 2 3 31 1 2 2 33Agirlik / Weight (kg):Sip. No / Order No:Hücre No / Cell No:MH...1

Pagina 27 - 11. MAINTENANCE CHECKLIST

33APPENDIX-2 TORBA FILTRE KASET FILTRE B=48mmTORBA+KASET FILTRETORBA+KASET FILTRE(FILTRE BASINÇ FARKI ÖLÇÜMÜ YAPILDIGINDA)KASET FILTRE B=95mmSizdirmaz

Pagina 28

34ÖNDEN SÜRMELI TORBA FILTRE MONTAJKAPIPANELÜST GÖRÜNÜSDETAY EDETAY DDETAY CDETAY BDETAY APVC BANT 6x15FILTRE TUTUCU YAYPVC BANT 6x15PVC BANT 6x15 PVC

Pagina 29

35COMBINED SIDE WITHDRAWAL FILTER MONTAGE

Pagina 30

36F8 – F9 SIDE WITHDRAWAL FILTER MONTAGE

Pagina 31

37F7 SIDE WITHDRAWAL FILTER MONTAGE

Pagina 32 - CELLCELLCELLCELL

38W H 287x287 437x287 437x592 592x287 592x592 287x287 287x592 437x287 437x592 592x287 592x592 W H 287x287 437x287 437x592 592x287 592x592 287x287 287x

Pagina 33 - ÖNDEN SÜRMELI FILTRE DETAYI

39APPENDIX-3/2 Front Withdrawal FilterFİLTRE BOYUT ve ADETLERİMODÜL PANEL FİLTRE TORBA FİLTRE MODÜL PANEL FİLTRE TORBA FİLTREW H 292x292 450x300 437x5

Pagina 34 - DETAY BDETAY A

10.9.3. Steam Heaters... 2310.10. Siphone

Pagina 35

40APPENDIX-4

Pagina 36

41: GOSB - Gebze Org. San. Bölgesi, Ş. Bilgisu Cad. 41480 Gebze-KOCAELİ Tel: (0262) 648 60 00 - Fax: (0262) 648 60 08: Sedat Simavi Sok. No: 48, 065

Pagina 37

51 - SAFETY CONSIDERATIONS1.1. GeneralThe 39HQ air handling units (AHUs) has been de-signed and manufactured in accordance with the CE machine directi

Pagina 38 - FİLTRE BOYUT ve ADETLERİ

6Electrical VoltageThis pictogram indicates that there are electrical components behind this access cover, door or panel that may be dangerous for the

Pagina 39 - FİLTRE BOYUT ve ADETLERİ

72.4. Offloading and HoistingDepending on the dimensions of the AHU and the situation on site, the AHUs are supplied in previously agreed transport se

Pagina 40 - APPENDIX-4

84. LIFTING INSTRUCTIONS4.1. GeneralThere are transport and lifting instructions attached to the AHU. 4.2. Lifting Bar CertificationThe lifting bars s

Pagina 41 - KAL ‹TE S‹S T

9- For hoisting ensure that the weight is evenly dis-tributed and that all previous steps are carried out correctly.If there is not enough space it m