Carrier 19XL Especificaciones Pagina 192

  • Descarga
  • Añadir a mis manuales
  • Imprimir
  • Pagina
    / 392
  • Tabla de contenidos
  • SOLUCIÓN DE PROBLEMAS
  • MARCADORES
  • Valorado. / 5. Basado en revisión del cliente
Vista de pagina 191
Machines with Isolation Valves
Transfer All Refrigerant to Condenser Vessel
1.
Push refrigerant into condenser.
a.
Valve positions:
b.
Turn off machine water pumps and pumpout condenser water.
c.
Turn on pumpout compressor to push liquid out of the cooler/compressor.
d.
When all liquid has been pushed into the condenser, close cooler isolation valve 11.
e.
Access the Control Test, Pumpdown table on the LID display to turn on the machine
water pumps.
f.
Turn off the pumpout compressor.
Valve
1a 1b 2 3 4 5 8 11 12 13 14
Condition
CCCCCC
Vista de pagina 191
1 2 ... 187 188 189 190 191 192 193 194 195 196 197 ... 391 392

Comentarios a estos manuales

Sin comentarios