For normal maintenance routines we recommend using 1 kg of
the concentrated product, diluted to 10%, to treat a coil surface
of 2 m
2
. This process can either be carried out with a
TOTALINE applicator gun (part No. PE01 WA 4000EE) or
using a high-pressure spray gun. With pressurised cleaning
methods care should be taken not to damage the coil fins.
If at all possible the direction of cleaning should be the
opposite of the air flow direction.
The two cleaning products can be used for any of the following
coil finishes: Cu/Cu, Cu/Al, Cu/Al with Polual, Blygold and/or
Heresite protection.
WARNING: Never use pressurized air or water, as this will
damage the fins, and always clean them against the normal air
flow direction.
Fan motor replacement
5. Using a straight-edge placed perdendicular to the motor
pulleys, mark the tip of each rim with a felt pen or a spot
of chalk. These marks will help count the number of turns.
6. Now unscrew each pulley flange the number of turns
required to obtain the required fan speed.
NOTE: Increasing the fan speed means increasing the
load on the fan motor. Do not exceed the maximum value
indicated in the Physical Data table.
7. Set the movable flanges at the nearest pulley hub key-way
and tighten the set screws.
8. Install the fan belts on the pulleys.
9. The correct tension is obtained when the belt can be
flexed 15 mm with one finger half way between the two
pulleys and without excessive effort. Check the belt
tension after three or four hours of operation.
10. After 24 to 48 hours of operation check the belt tension
once again. If the belt tension is to high or too low, this
will affect the operating lift of the belt.
Proceed as follows:
1. Remove the fan access panel on the control box side.
2. Slide a sheet of cardboard over the coil to protect it.
3. Remove the damaged motor by sliding it from its support.
4. Fit the new motor by following the operation described
above in reverse order.
5. Adjust the belt tension.
6. Replace all panels.
Fan adjustment and pulley alignment
In order to obtain the optimum fan performance, the following
instructions should be carried out during the unit installation:
once the system ducting is installed and the static pressure
requirement has been calculated, the necessary fan speed can
be established by referring to the corresponding chart in the
product data. On new units, the fan speed is factory-set to mid
range.
To modify the fan speed:
1. Disconnect the unit power supply.
2. Remove the fan compartment enclosure panel on the
control box side.
3. Remove the fan belts. To do this, loosen the hexagonal fan
motor nut (ø 24 mm) and slide the motor on its support.
4. Move the fan motor forward and slip the belts over the
pulley rims. Loosen the movable pulley flange set screws
(on the fan motor pulley) and screw both movable flanges
completely toward the fixed centre flange.
11. Pulley alignment should be checked before the belt
tension is adjusted. The straight-edge should be placed on
the side of the pulleys, and the belt must be parallel with
the edge. With movable flanges use a wooden block or
similar to compensate the width difference. The block
thickness should be half the pulley width difference.
12. When the tension and alignment are correct, reinstall the
bolts on the fan rotation axis. Refit the enclosure panels
and connect the power supply. Start the unit and check to
ensure that the fan discharge volume is correct.
Deflection F, 15 mm
L
2
Load, kg
Straight-edge
Wooden block
Distance between centres L, mm