Carrier operating and maintanance Manual del operador Pagina 27

  • Descarga
  • Añadir a mis manuales
  • Imprimir
  • Pagina
    / 44
  • Tabla de contenidos
  • SOLUCIÓN DE PROBLEMAS
  • MARCADORES
  • Valorado. / 5. Basado en revisión del cliente
Vista de pagina 26
Rev. __________
Date _________
2.9
7. Roll (lower deck)
Raise the roll handle (first lever) and move the lower deck in line with the
upper deck. This will let the load slide backwards on the deck. The upper
and lower deck surfaces should be in alignment. Be careful not to run the
lower deck into the upper deck. The two decks should barely touch.
8. Winch (upper deck)
Using the upper deck winch lever (sixth lever), winch the load up to the tire
stops of the upper deck. Keep the winch cable taut at this point.
9. Tilt (upper deck)
Tilt the upper deck down to its original position. After upper deck is in its
stowed position, secure the load to the upper deck. Never rely solely on
the winch to hold the load. At this point the lower deck can either be re-
turned to its stowed position or can be loaded as shown previously.
7
8
9
Vista de pagina 26
1 2 ... 22 23 24 25 26 27 28 29 30 31 32 ... 43 44

Comentarios a estos manuales

Sin comentarios