
(2)
Coat threads and bolt head contact surface with sealing paste AMV 188 001 02,
or equivalent.
(3)
Clean all grease and oil from bolt threads.
(4)
For torque specification, see
Fig. 30
.
(5)
For torque specifications related to timing belt components, also refer to
Fig. 37
and
Fig. 46
.
1996 Volkswagen EuroVan CV
COOLING SYSTEM REMOVAL & INSTALLTION - 2.4L DIESEL
4 января 2005 г. 0:54:44 Page 62 © 2004 Mitchell Repair Information Company, LLC.
Comentarios a estos manuales