MAINSTAT screen). This value has limits of 40% to 100%. In
addition, the CONTROL POINT for the lag chiller must be
modified to a value of 3 F (1.67 C) less than the lead chillers
CONTROL POINT value. If the LOAD BALANCE OPTION is
disabled, the ACTIVE DEMAND LIMIT and the CONTROL
POINT are both forced to the same value as the lead chiller.
AUTO. RESTART AFTER POWER FAILURE — When an
auto. restart condition occurs, each chiller may have a delay
added to the start-up sequence, depending on its lead/lag
configuration. The lead chiller does not have a delay. The
lag chiller has a 45-second delay. The standby chiller has a
90-second delay. The delay time is added after the chiller water
flow is verified. The PIC III ensures the guide vanes are closed.
After the guide vane position is confirmed, the delay for lag
and standby chillers occurs prior to energizing the oil pump.
The normal start-up sequence then continues. The auto. restart
delay sequence occurs whether the chiller is in CCN or
LOCAL mode and is intended to stagger the compressor motor
starts. Preventing the motors from starting simultaneously
helps reduce the inrush demands on the building power system.
Ice Build Control — The selectable ice build mode per-
mits use of the chiller to refreeze or control the temperature of
an ice reservoir which may, for example, be used for thermal
storage. This mode differs from water or brine chilling in that
termination (indication that the need for cooling has been
satisfied) is based on input(s) other than the temperature which
is being controlled during operation.
NOTE: For ice build control to operate properly, the PIC III
must be in CCN mode.
The PIC III can be configured for ice build operation.
From the SERVICE menu, access the EQUIPMENT SER-
VICE table. From there, select the OPTIONS screen to
enable or disable the ICE BUILD OPTION. See Table 4,
Example 19.
•The ICE BUILD SETPOINT can be configured from the
SETPOINT display, which is accessed from the PIC III
main menu. See Table 4, Example 10.
The ice build schedule can be viewed or modified from the
SCHEDULE table. From this table, select the ice build
schedule (OCCPC02S) screen. See Fig. 19 and the section
on Time Schedule Operation, page 25, for more information
on modifying chiller schedules.
The ice build time schedule defines the period(s) during
which ice build is active if the ice build option is enabled. If the
ice build time schedule overlaps other schedules, the ice build
time schedule takes priority. During the ice build period, the
CONTROL POINT is set to the ICE BUILD SETPOINT for
temperature control. The ICE BUILD RECYCLE and ICE
BUILD TERMINATION parameters, accessed from the
OPTIONS screen, allow the chiller operator to recycle or
terminate the ice build cycle. The ice build cycle can be
configured to terminate when:
•the ENTERING CHILLED WATER temperature is less than
the ICE BUILD SETPOINT. In this case, the operator sets
the ICE BUILD TERMINATION parameter to 0 (the default
setting) on the OPTIONS screen.
the ICE BUILD CONTACTS input from an ice level indi-
cator are opened. In this case, the operator sets the ICE
BUILD TERMINATION parameter to 1 on the OPTIONS
screen.
the chilled water temperature is less than the ICE BUILD
SETPOINT and the ICE BUILD CONTACTS input from
an ice level indicator are open. In this case, the operator sets
the ICE BUILD TERMINATION parameter to 2 on the
OPTIONS screen.
the end of the ice build time schedule (OCCPC02S) has
been reached.
ICE BUILD INITIATION The ice build time schedule
(OCCPC02S) is the means for activating the ice build option.
Ice Build is enabled if:
a day of the week and a time period on the ice build time
schedule are enabled. The SCHEDULE screen shows an X
in the day field and ON/OFF times are designated for the
day(s),
and the ICE BUILD OPTION is enabled.
The following events take place (unless overridden by a
higher authority CCN device).
CHILLER START/STOP is forced to START.
•The CONTROL POINT is forced to the ICE BUILD SET-
POINT.
Any force (Auto) is removed from the ACTIVE DEMAND
LIMIT.
NOTE: A parameters value can be forced, that is, the value
can be manually changed at the ICVC by an operator, changed
from another CCN device, or changed by other algorithms in
the PIC III control system.
NOTE: The Ice Build steps do not occur if the chiller is config-
ured and operating as a lag or standby chiller for lead/lag
operation and is actively being controlled by a lead chiller. The
lead chiller communicates the ICE BUILD SET POINT, the
desired CHILLER START/STOP state, and the ACTIVE
DEMAND LIMIT to the lag or standby chiller as required for
ice build, if configured to do so.
START-UP/RECYCLE OPERATION If the chiller is not
running when ice build activates, the PIC III checks the fol-
lowing conditions, based on the ICE BUILD TERMINATION
value, to avoid starting the compressor unnecessarily:
•if ICE BUILD TERMINATION is set to the TEMP option
and the ENTERING CHILLED WATER temperature is less
than or equal to the ICE BUILD SETPOINT;
•if ICE BUILD TERMINATION is set to the CONTACTS
option and the ICE BUILD CONTACT is open;
•if the ICE BUILD TERMINATION is set to the BOTH (tem-
perature and contacts) option and the ENTERING
CHILLED WATER temperature is less than or equal to the
ICE BUILD SETPOINT and the ICE BUILD CONTACT is
open.
The ICE BUILD RECYCLE on the OPTIONS screen
determines whether or not the chiller will go into an ice build
RECYCLE mode.
If the ICE BUILD RECYCLE is set to DSABLE (disable),
the PIC III reverts to normal (non-ice build) temperature
control when the ice build function is terminated by satisfy-
ing one of the above conditions. Once ice build is termi-
nated in this manner, it will not be reinitiated until the next
ice build schedule period begins.
If the ICE BUILD RECYCLE is set to ENABLE, the PIC III
goes into an ICE BUILD RECYCLE mode, and the chilled
water pump relay remains energized to keep the chilled
water flowing when the compressor shuts down. If the tem-
perature of the LEAVING CHILLED WATER later increases
above the ICE BUILD SETPOINT plus half the RECYCLE
RESTART DELTA T value, the compressor restarts, control-
ling the chilled water/brine temperature to the ICE BUILD
SETPOINT.
TEMPERATURE CONTROL DURING ICE BUILD —
During ice build, the capacity control algorithm shall use the
CONTROL POINT minus 5 F (–2.8 C) for control of
the LEAVING CHILLED WATER temperature. The ECW
CONTROL OPTION and any temperature reset option shall be
ignored, if enabled, during ice build. Also, the following
control options will be ignored during ice build operation:
ECW CONTROL OPTION and any temperature reset
options (configured on TEMP_CTL screen).
20 mA DEMAND LIMIT OPT (configured on
RAMP_DEM screen).