79
Variable Airflow for 0-10 Vdc Input (42SM Only) (See
Fig. 97) — Carrier recommends using the specified thermostat
or DDC controller to commission the unit whenever possible.
However, the blower can be started and operated without the
thermostat. To do so, locate the airflow adjustment screw
which is accessible from the inside of the control box. With
service switch in the “ON” position, turn the adjustment screw.
The unit has now been placed in manual override. Manual
override will expire when one of the following conditions is
satisfied:
• Power to the unit is cycled
• 15 minutes elapse with no change to adjustment screw
• Unit receives a control signal from the thermostat or
controller
3-Speed Jumper Field Adjustment (See Fig. 98)
— The unit
has been factory configured to produce PSC equivalent airflow
on high speed, with medium and low speed set at 80% and
60% of high, respectively. If these settings are acceptable, then
no further configuring is required.
If alternative airflows are desired, use board mounted pots
to adjust the airflow associated with each input. Each output
can be adjusted from 0 to 100% of the motor’s factory pro-
grammed operating range. Use voltmeter and airflow chart (on
control box cover) to set values. Refer to Appendix A for ad-
justment procedure.
4-Discrete Speed Potentiometer Field Adjustment, Solid
State — The unit has been factory configured to produce PSC
equivalent airflow on high speed, with medium and low speed
set at 80% and 60% of high, respectively. If these settings are
acceptable, then no further configuring is required.
Board mounted pots are provided to adjust the airflow per-
taining to each output. Each output can be adjusted from 0 to
100% of the motor’s factory programmed operating range. Use
voltmeter and airflow chart (on the control box cover) to set
values. Refer to Appendix B for adjustment procedure.
Variable Airflow for 0-10 Vdc Input (See Fig. 99)
— If a
factory provided thermostat or DDC controller is utilized, then
the unit is already correctly configured.
Carrier recommends using the specific thermostat or DDC
controller to commission the unit whenever possible. Howev-
er, the blower can be started and operated without the thermo-
stat. To do so, locate jumper 7 near the large capacitor. Move J7
from 0-10 to Man. Once moved, the onboard pots control fan
speed. To switch the fan in this configuration, place a dry con-
tact inline or on the enable wire.
START-UP
Before beginning any start-up operation, the start-up per-
sonnel should familiarize themselves with the unit, options and
accessories, and control sequence to understand the proper sys-
tem operation. All personnel should have a good working
knowledge of general start-up procedures and have the appro-
priate start-up and balancing guides available for consultation.
The building must be completely finished including doors,
windows, and insulation. All internal walls and doors should
be in place and in the normal position. In some cases, the inte-
rior decorations and furniture may influence overall system
performance. The entire building should be as complete as
possible before beginning any system balancing.
Except as required during start-up and balancing operations,
no fan coil units should be operated without all the proper duct-
work attached, supply and return grilles in place, and all access
doors and panels in place and secure.
Fig. 97 — ECM Proportional Speed Board
a42-4313
L2
LOW
MED
HIGH
VR1
VR2
VR3
K1
K2
K3
LOW
MED
HIGH
COM
C1
C2
C3
CR1
L1
POTS
Fig. 98 — 3-Speed Potentiometer Adjustment
CAUTION
Both of the start-up and servicing procedures described
below require the control box to be powered while adjust-
ments are made. Line voltage components are concealed
behind a secondary cover. However, installer should still
take all reasonable precautions.
Fig. 99 — ECM Proportional Speed Board
a42-4313