Carrier operating and maintanance Especificaciones Pagina 74

  • Descarga
  • Añadir a mis manuales
  • Imprimir
  • Pagina
    / 116
  • Tabla de contenidos
  • MARCADORES
  • Valorado. / 5. Basado en revisión del cliente
Vista de pagina 73
5-376-000097
REV. 1 - 12/08
Section II: Operation
Page 64
19. Remove the wheel chocks from
the carrier's rear tires.
20. Disconnect the power take-off
(PTO). Refer to PTO operator’s
manual. NEVER TRAVEL WITH
THE POWER TAKE-OFF
CONTROL ENGAGED. This
could result in damage to the
PTO unit and the recovery
vehicle’s transmission.
21.Use the reverse order for
unloading.
WARNING:
Properly secure the vehicle to the wheel grid using tie-down straps.
Tie-down straps should be tightened periodically during the tow as
the tires settle into the grid from towing.
WARNING:
Properly secure the vehicle using safety chains from the vehicle to
the carrier subframe.
TAKE-OFF
AKE-OFF
IN
IN
OU
Vista de pagina 73
1 2 ... 69 70 71 72 73 74 75 76 77 78 79 ... 115 116

Comentarios a estos manuales

Sin comentarios